This shows you the differences between two versions of the page.
en:sim:manual:jak_na_instalaci:omron [2014/09/30 09:27] ondra |
en:sim:manual:jak_na_instalaci:omron [2014/09/30 09:43] (current) ondra |
||
---|---|---|---|
Line 2: | Line 2: | ||
---- | ---- | ||
{{ .:omron.png?nolink&500 |}} | {{ .:omron.png?nolink&500 |}} | ||
+ | \\ \\ | ||
+ | In case of the involvement of multiple inverters, connect the inverters each other this way: | ||
+ | ^ Inverter 1 ^ Inverter 2 ^ | ||
+ | | 6:GO | 6:GO | | ||
+ | | B+ | B+ | | ||
+ | | A- | A- | | ||
+ | On the last inverter is necessary to turn on or off the termination. Termination Enabled = terminals 9+10 connected. | ||
===== Configuration Notes ===== | ===== Configuration Notes ===== | ||
{{ .:omron_rady.png?nolink&450 |}} | {{ .:omron_rady.png?nolink&450 |}} | ||
+ | |||
+ | |||
+ | <WRAP left> | ||
+ | [[..:jak_na_instalaci:stridace|<< Back]] | ||
+ | </WRAP> |